
Introduction
In this section I will present the work completed on our plane by the manual section, which will hopefully be of use to our fellow builders.
Table of Contents
Overview
Materials
Construction Techniques
Tools
Suggested Construction Procedures
Wing Cores (FB)
Wing Skins (FB)
Winglet (FB)
Winglet Attachment (FB)
Critical Dimensions (FB)
Glassing the Canard (FB)
Canard Final Preparation for Elevators
Elevator Cuff Installation (No longer required)
5. Bulkheads
Bulkhead Preparation (FB)
6. Speed Brake
June 16, 2002
7. Lower Cowl
9. Landing Gear
10. Fuselage (Fast Build)
Pedal System / Brake Cylinders
Initial Fit of Canard to Fuselage
Windows (FB)
Doors (FB)
Latches (FB)
Carbon Beams (FB)
Finishing the Doors (FB)
Template
12. Control Systems
13. Electrical / Instrumentation
Pitot-Static and Vacuum Instruments
14. Fuel System
16. Wheels / Axles
Alternate Oil Cooler Installation
Spinner Installation
18. Fairings
19. Interior
20. Final Assembly and Finishing
Description and Specifications
Final Assembly Procedures
Lofting / Weight and Balance
21. Flight Testing
Final Preparation
Testing
22. Appendices
Material Sources
Specialty Suppliers
Aileron Construction Alternative
Coloring Book